top of page

Eve River Bank Protection

Environmental Monitoring

This project involved full-time environmental monitoring and flow management for bank protection works on the Eve River completed by Wacor for the Ministry of Transportation and Infrastructure. The project required water quality monitoring, extensive fish salvage, planning and installation for multiple temporary cross-channel flow diversion structures, and implementation of large-scale pump and flow management strategies in an environmentally sensitive river system.

bottom of page